Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month.
Click here for info.
HOME
.COM
.ORG
.US
.NET
FORUM
TRAVEL
RAILFANS
MODEL RR
Latest Reports
Featured Today
FREE e-Newsletter
Slideshows
The Big Stories
Directory
This website has been archived from TrainWeb.org/dsrg to TrainWeb.US/dsrg.
Changes!
We all need change to keep our lives new.
.
And so does the
DS&RG
!
The first change to be made on the Railroad
has been done. This was not so much a change,
but an enhancment of what I had done earlier.
It involved moving some rock work closer to the
rails. This was to make the train look better as it
was passing through the area.
Feb. 1999
Photo 1
Change
I enhanced the look of this area
Feb. 1999
Photo 2
Change
I have moved the rock work closer to the track
June 2000
Photo 3
Change
I have removed the rocks lining the right side of the tracks
June 2000
Photo 4
Change
I have removed the rocks lining the left side of the tracks
Jan. 2001
Photo 5
Change
I have Rebuilt most of the switches with new #8 frogs
and redesignes the track plan.
Mar. 2001
Photo 6
Change
I have rebuilt the Bear Flatt siding.
Back to Switch Yard
Updated
15 March 2001
HOME
.COM
.ORG
.US
.NET
FORUM
TRAVEL
RAILFANS
MODEL RR
Latest Reports
Featured Today
FREE e-Newsletter
Slideshows
The Big Stories
Directory
Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month.
Click here for info.