Guelph Junction Railway

Eramosa River trestle Guelph.

Mile 29.75

This major project took place over 4 months at a cost of about $1.83 million increasing load capacity to 300,000 lbs.

This new steel pile trestle was a major project to replace a very old wooden pile trestle.

 

Work was carried out under traffic with the new structure built around the old structure.

Three photos: Tim Ball November 17, 2015


 

 

Mile 29.75 181_506 southbound at wooden pile creosote ballasted deck trestle
181 feet long over the Eramosa River. Two views: November 6, 2005 David Young

 