The taller bridge will probably be an open arch bridge (it's awfully hard to make one out of Styrofoam) which will give you a better view of the lower inner bridge which may be a wooden type of bridge. The river bed will be at the edge of the section frame, we intend to use two inches of construction foam to create the ground level, and the track will be mounted on plywood sub-roadbed on wooden risers for strength and stability. From the top of the mountain to the bottom of the river will be over 16 inches. (You are here: SJSG Home -> Layouts -> New Layout Index -> Picture05)
Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month.
Click here for info.
|