This website has been archived from TrainWeb.org/sjsg to TrainWeb.US/sjsg.

Photo by Joe Balcer The tracks will run through a cut in the hills on the lower level just outside of the city.

The upper deck will contain our city - and one mainline. The two main tracks on the lower level will pass through a cut in the rocks - and will cross under a highway bridge joining the two upper decks. The near left turnout (still to be laid) will run under the city to the staging track on the inside of the layout..

Home Index Prev Next

(You are here: SJSG Home -> Layouts -> New Layout  Index -> Picture16)

ad pos61 ad pos63
ad pos62 ad pos64
Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.