|   | 
Road No
 | 
Type
 | 
Notes
 | 
|   | 
1
 | 
0-4-2 | 
Porter locomotive, the original locomotive used to construct the
TF&E.  Used a switcher and transfer locomotive.  Stock Bachmann
Model | 
|   | 
3
 | 
Shay
 | 
Two Truck Bachmann Shay, Stock at the moment | 
  | 
4
 | 
4-6-0 | 
Locomotive scratchbuilt on the chasis of an HO scale large drivered
Bachmann 4-6-0.  Represents a 1916 Baldwin loco deleivered to the
TF&E from Western Consolidated stock shortly before WWI.  | 
 | 
5
 | 
0-6-0 | 
Locomotive built on the chasis of a Bachmann low drivered 4-6-0. 
Will be used as a transfer engine between Port Lavender and Tug fork, as
well as occasional stone runs to the quarry. |